Skip to content

Click anything in your drawings. See everything connected to it.

Primepoint links every callout, tag, symbol, and schedule row to the sheets, specs, RFIs, and submittals behind it. Click once and see the whole picture.

Take a self-guided tourTalk to our team

Every detail, instantly connected to its source.

Primepoint builds a knowledge graph that connects every project element, so your entire project becomes searchable.

Connected Documents
01

Automatic linking

Every door tag, finish tag, and equipment tag connects to its schedule and specification, with no manual tagging or setup.

02

Instant traversal

Click through from any element to its complete context, including schedules, specs, related details, and dependent items, in a single action.

03

Current as the set changes

New sets sync from Procore or Autodesk Forma, and every connection updates to keep the whole set current.

Not a chatbot on your PDFs.

A language model on its own reads the text layer and guesses at the rest. Primepoint reads the actual drawing, connects everything across the document set, and then Marvin tackles almost anything you can imagine.

TAG 150ODSCHEDULECALLOUT 5/A-5.1
01 · Vision models

Read every sheet

Our models, trained on construction drawings, find every tag, callout, schedule, and detail on the linework, before anyone asks a question.

A-1.1 PLANDOOR SCHEDULETAG 150OD08 14 16SUBMITTALRFI 003
02 · Knowledge graph

Connect the whole job

Each tag links to its schedule row, each callout to its detail, and each note to the RFI that changed it, across every document on the project.

MARVINS-0.0H · NOTE 13GENERAL NOTES
03 · Marvin

Do the work, with receipts

Marvin reads across the graph to review, compare, and draft, and every claim points to the exact source so your team can check it.

As a controls manager, I'm always looking at where time and money are going. Primepoint can reduce document navigation time by up to 50%, resulting in measurable cost savings. It reduces rework, improves quality outcomes, and strengthens risk management.
Curtis SmithGroup Controls Manager, Sundt Construction

What gets connected

Callouts and detail tags

Click a section, elevation, or detail callout and land on the detail, on the right sheet, at the right zoom.

“It is the tool that all of us would wish we had come up with ... you hyperlink everything, you label everything, you make it searchable.”

Eric CylwikVice President and Corporate Director of Innovation, Sundt Construction

Callout 5/A-5.1

Click on A-2.1 · Level 1 plan

Opens A-5.1 · Detail 5, zoomed to the detailGo to detail
Also referenced on A-2.1 · Level 1 planSheet
Also referenced on A-3.2 · Building sectionSheet

Tags, schedules, and specs

Hover a door, fixture, or equipment tag to see its schedule row and governing spec section without leaving the plan.

“Our job is to be nerds of the drawings and specs, and we want that detail at our fingertips.”

Zach HuntSenior Project Engineer, Fortis Construction

TAG 150OD · door schedule row

Hover on A-1.1 · Floor plan, Level 1

Door typeF
FrameHM-2
Hardware set12
Finish08 71 00 §2.7

Across disciplines, RFIs, and submittals

See every place an element appears across architectural, structural, and MEP sheets, plus every RFI and submittal that touched it, so nothing is left out of scope.

“I know my drawings really well, but even I might only know 5 out of the 7 places to look. Primepoint knows all 7 places.”

Brody SlaugenhoupEnterprise Project Engineer, Sundt Construction

Everywhere TAG 150OD appears

One click from the tag on the plan

A-1.1 · Floor plan, Level 1Plan
A-601 · Door scheduleSchedule
08 71 00 §2.7 · Door hardwareSpec
RFI 003 · Door 150OD finishRFI
08 71 00-02 · Hardware submittalSubmittal

What teams say about it

“This is absolutely wild. The way that you guys have connected it to the drawings and just made it so simple. You've put it at everybody's fingertips.”
Zach HuntSenior Project Engineer, Fortis Construction
“It is transformational. Using Primepoint is like going from encyclopedias to Wikipedia but for our construction documents.”
Eric CylwikVice President and Corporate Director of Innovation, Sundt Construction
“It makes navigating our project documents around in the field 10 times faster. Well, maybe even more.”
Brody SlaugenhoupEnterprise Project Engineer, Sundt Construction

Questions

Do we have to tag anything?

No. Primepoint finds the tags, callouts, schedules, and details on the linework and connects them automatically, with no manual tagging or setup.

What happens when a new revision is issued?

New sets sync from Procore or Autodesk Forma, or you upload them. Primepoint reads the new revision and connects it to everything else on the project.

Does it work in the field?

Yes. The same connected set works on the web, the desktop app, iPhone, and iPad.

Explore more of the platform