RFIs, answered or drafted for you.

Checks an RFI against drawings and specs, shows what's already answered to avoid unnecessary and duplicate submissions, and drafts the rest.

Talk to our team

Your PE reads one answer and its sources instead of spending a morning in the drawings.

RFI Assistant
01

Is it already answered?

Primepoint checks the drawings, the specs, and past RFIs, and shows the exact detail or paragraph that answers the question, or says no RFI is needed.

02

Pinned to every sheet it touches

The RFI shows up on each sheet it affects, so the field builds from the answer, not the superseded drawing.

03

A draft, sources cited

The answer to send back, or a clear RFI for the design team, ready for your PE to review.

From an incoming question to a clear answer

Answered before it's submitted

When a sub's question is already covered by a typical detail or a spec paragraph, Primepoint points to it and marks the RFI as not needed. Your team answers in minutes instead of waiting on the design team.

Primepoint · RFI Assistant
RFI AssistantNew RFI review
Original RFI · from Procore
RFI-412

Pipe spacing detail

“There are no details shown on the drawings for the pipe spacing requirements in concrete decks. Please provide detail.”

RFI analysis
NO RFI NEEDED

Typical detail A on S-3.4H covers it: pipe penetrations through concrete decks keep a clear distance of 1.5 × the largest adjacent pipe diameter between sleeves S-3.4H · Typical details

Pinned on S-3.4H and P-2.1

Proposed response
Review response
S-3.4H TYPICAL DETAILS1/1 · 38%
1.5 × D MIN.ATYPICAL DETAIL · PIPE THRU SLAB
Sheets this RFI touches
S-3.4H · Typical detailsAnswer
P-2.1 · Plumbing plan, Level 2Pinned

Sample: an incoming RFI on pipe spacing, answered by a typical detail on S-3.4H.

No duplicate RFIs

Before anything goes out, Primepoint finds every related RFI during a lookup, so your team doesn't submit a question the design team has already answered.

  • Platform
  • Closed RFIs stay searchable in the project knowledge graph
  • Drafts with the references attached

Related RFIs · pipe penetrations

Sample: found during a lookup on RFI-412

RFI-388 · Sleeve spacing at Level 2 deckAnswered
RFI-402 · Pipe sleeve at grid C/4Answered
RFI-412 · Pipe spacing detailCovered by S-3.4H

Every RFI, read across the whole job.

RFIs connect to drawings, details, specs, and past correspondence. Primepoint follows every one of those links before it answers.

LINKED ON EVERY PROJECT

DrawingsDetailsSpecsPast RFIsSubmittalsCorrespondence
PE

Which sheets does RFI-394 touch?

M

S-201, two details, and spec 03 30 00. It's pinned on all of them.

S-20103 30 00RFI-394

How it works

Step 1

The RFI syncs in

From Procore or Autodesk Forma, with its attachments. Nobody forwards anything.

Step 2

Primepoint reads across the job

The sheets, details, spec sections, and past RFIs connected to the question, through the knowledge graph.

Step 3

Your team reviews

One answer, every source one click away, and a drafted response ready to go back to the RFI.

I was able to answer the sub's question in the RFI draft in five minutes instead of processing the RFI and waiting two weeks for a response.
Zach HuntSenior Project Engineer, Fortis Construction

Questions

Does RFI Assistant work with Procore and Autodesk Forma?

Yes. RFIs sync in from Procore or Autodesk Forma with their attachments, so your team reviews them in Primepoint without forwarding anything.

What happens when the documents already answer the RFI?

Primepoint shows the exact detail, note, or spec paragraph that answers it and marks the RFI as not needed, with the source one click away.

How does it help avoid duplicate RFIs?

During a lookup, Primepoint finds every related RFI on the project, so your team can see whether the question was already asked and answered.

Who sends the response?

Your team does. Primepoint drafts the response or the RFI with the references attached, and your PE reviews it before it goes anywhere.